HMS Protector

We have recently completed an interim hull refurbishment on HMS Protect, a Royal Nave icebreaker, at the UKdocks drydock in Middlesbrough, UK. A 3 week programme of washing, blasting and painting of selected areas. She is expected to return next year for further work on the hull and many other areas.

 

RIMG0255_Copy.JPG

 

 

RIMG0330_Copy.JPG

 

Thursday, 16 August 2018 09:52

Trianel Off-shore Wind Farm

We are pleased to announce that Howard Jess Solutions Limited are working on the final load-ins and load-outs for the Trianel Offshore Wind Farm project.

Tuesday, 05 April 2016 12:37

6 TPs leave Hoboken

6 TPs leave Hoboken on their way to Vlissingen before installation in the Rampion Windfarm project.

 

Thursday, 03 March 2016 12:33

Wind Energy Network article

Howard Jess Solutions have been featured in the March issue of Wind Energy Network magazine.

 

The article can be seen at http://www.windenergynetwork.co.uk/enhanced-entries/howard-jess-scicon/

 

Friday, 26 February 2016 13:40

Race Bank Topside on the move

570 tonnes of steel, part of the Race Bank top-sides, moving out after completion of this pahse of the project.

Coating work qc'ed by Howard Jess Solutions Limited.

Wednesday, 06 January 2016 08:23

Multiple Off-shore Wind Farm Projects

Following a very successful 2015 Howard Jess Solutions are now working on several wind farm projects in the Antwerp area. These include Rampion, Dudgeon, Burbo Bank, and Race Bank. The work includes coating inspection services on transition pieces, jackets and platforms.

 

Latest Blogs

  • HMS Protector
    We have recently completed an interim hull refurbishment on HMS Protect, a Royal Nave icebreaker, at the UKdocks drydock in…
  • Trianel Off-shore Wind Farm
    We are pleased to announce that Howard Jess Solutions Limited are working on the final load-ins and load-outs for the…
  • 6 TPs leave Hoboken
    6 TPs leave Hoboken on their way to Vlissingen before installation in the Rampion Windfarm project.  
  • Wind Energy Network article
    Howard Jess Solutions have been featured in the March issue of Wind Energy Network magazine.   The article can be…
  • Race Bank Topside on the move
    570 tonnes of steel, part of the Race Bank top-sides, moving out after completion of this pahse of the project.…
  • Multiple Off-shore Wind Farm Projects